Drydocks World Dubai has installed a trial version of a Grounding Avoidance System on the 46,803 tonne oil tanker British Tenacity for BP Shipping.
As per report personnel from Drydocks World Dubai worked for 12 days to modify British Tenacity’s bow and fabricate the structures
0 comments:
Post a Comment