It is reported that IVRCL Infrastructures & Projects Ltd has bagged orders of INR 523.31 Crores from UP Jal Nigam for integrated Sewerage works under JNNURM in Allahabad and from Kakade Infrastructure for Five Building towers, Super-specialty hospital and a star hotel in Pune. The orders of INR 523.31 Crores are from Water and Buildings Divisions.
The company has secured an order for Survey, Investigation, Design, Construction, Testing & Commissioning of Sewerage works in Sewerage District of Allahabad City an integrated project on trunkey basis awarded by UP JAL NIGAM of ALLAHABAD under JNNURM valued at INR 287 crores.
The total completion period is 36 months. The project involves Construction of 60 MLD Sewerage Treatment Plant with 10 Years O&M; Construction of 10 metre Bund wall to protect STP; Supplying and Laying of RCC Pipes from 200mm to 1400mm dia to a length of 142 KM in Allahabad City and all allied Civil Works; Rehabilitation of Trunk Sewers by CIPP Method (work includes de-silting of sewers with super suction machine and high pressure jetting as well as cleaning of sewer with clear water and CCTV Survey); Renovation / Lip gradation of Existing Sewage Pumping Stations at three different locations; Construction of New Sewage Pumping Stations at three different locations with 5 Years O&M.
The company has secured another project for construction of Five Building towers with Parking plus Twenty one floors, 11,90,000 square feet area in Kakade City of Pune. Construction of Ruby Baner Hospital at Boner, a super-speciality hospital in Pune and Construction of Grand Maratha Hotel, a star hotel at Kalyani Nagar, Pune totaling to INR 236.31 Crores awarded by KAKADE INFRASTRUCTURE of Pune.
http://www.steelguru.com/news/index/2009/10/12/MTE1NTU4/IVRCL_Infrastructures_secures_orders_worth_INR_523.31_crores.html


0 comments:
Post a Comment