Adani Power Ltd is likely to commission its second 330 MW unit at Mundra towards the end of September or early October.
According to sources, the generation from the existing 330 MW unit was stabilized at full capacity last week. The unit was brought on stream in May. However the existing
Source From: http://www.steelguru.com
0 comments:
Post a Comment